Skip to content

Tie

Homer Rhode Loop Knot

Heavy-leader free-swing loop for lure action.

Intermediate · Monofilament / Fluorocarbon

Connection card

Homer Rhode Loop Knot

For line → loop (fixed end loop), line → lure.

What it joins Line → loop (fixed end loop) · Line → lure. In monofilament, fluorocarbon.
Turns 3 to 6. Count them before you seat it; afterwards you are guessing.
Shape Completed join or loop structure
Tag end Tags short and correct path
Seated Fully seated
Start again if Too few wraps on heavy leader. Loop walks and cinches

This card does not say how strong the knot is. A retention figure comes from a bench, in one material, at one diameter, tied by somebody who ties it all day — and the line in your hand is none of those. What it does tell you is whether the thing you have just tied is the thing the record describes.

What this plate is telling you

Heavy-leader free-swing loop for lure action.

Save this as a picture and it works with a dead signal and a nearly dead battery, which is when a joint is most often tied badly. The rest of this page — the steps, the seating sequence, the failure modes and the bench — is for the evening before.

Before you start

  • ·NetKnots notes it can be tied in very heavy leader or line and leaves a loop of any size at a hook, fly or lure.
  • ·The Fisherman describes it for monofilament and fluorocarbon leaders from 20- to 80-pound test.
  • ·Start the first overhand about 10 cm (4 in) from the end. The gap between the two knots sets the finished loop size.
  • ·In heavy leader, grip the lure with pliers and wear gloves; NetKnots says they are needed to set the knot firmly.
Line + hardware: Heavy mono or fluoro, Lure or terminal with eye

Step 1 of 4. Tie a loose overhand knot about 10 cm (4 in) from the end. Pass the tag through the eye and back through the overhand, entering on the side the tag leaves it, then snug the overhand close to the eye.

How to tie it — step 1 / 4

No drawing of this exact knot yet. The written steps are the reference.

swipe to step

01

Tie a loose overhand knot about 10 cm (4 in) from the end. Pass the tag through the eye and back through the overhand, entering on the side the tag leaves it, then snug the overhand close to the eye.

You should now see

A snug overhand in the standing line sitting at or just above the eye, with the tag running through the eye and back through that overhand beside the line.

If it goes wrong

Taking the tag back through the overhand from the wrong side. The tag crosses over itself inside the knot and the overhand will not slide close to the eye.

Fix: Pull the tag back out of the overhand and pass it through again from the side where the tag leaves the knot.

Why: The tag has to run through the first knot so the knot can slide along it later. Starting that knot close to the eye keeps the loop size under your control.

What fails if this is wrong
  • Loop size set after the wrapsYou cannot fix the swing after the barrel is on. Size the loop first.

Watch the tie

Homer Rhode Loop Knot- Heavy Leader- Saltwater ExperienceSaltwater Experience - Tom Rowland Podcast · Opens on YouTube

External video from a creator we follow — not produced by us. Nothing on this page loads from YouTube until you follow the link.

Seating sequence — where failures are born

The step list compresses the finish. Run these phases in order, one at a time.

  1. 01 Moisten

    Wet the structure before any load reaches it.

    Zero. Nothing tightens yet.

  2. 02 Load

    Take up slack slowly until the wraps begin to gather.

    Light and even — both ends moving together.

  3. 03 Dress

    Watch the wraps stack in order; stop and back off if any cross.

    Hold, do not pull. Correction happens here or not at all.

  4. 04 Set

    One continuous pull to full seat — no sawing, no jerks.

    Firm, single direction, standing line against the terminal end.

  5. 05 Trim

    Cut the tag square, leaving a short stub proud of the knot.

    None. Never trim under load.

Finished structure — what correct looks like

No drawing of this exact knot yet. The written steps are the reference.

  • ·Completed join or loop structure
  • ·Fully seated
  • ·Tags short and correct path
  • ·Even, no crossings

Verify before you load it

Every line is pass or fail. One fail means retie — do not load a knot you argued with.

  • 01Completed join or loop structure
  • 02Fully seated
  • 03Tags short and correct path
  • 04Even, no crossings
  • 05None
  • 06homer-rhode
Something failed → open Diagnose

Field notes — dark, cold, gloves

  • ·Retie by feel first, light second — the seat is a tactile event, not a visual one.
  • ·Gloves off for the dress phase. Fabric hides a crossing wrap.
  • ·Wrong twice in a row means the material or the hardware is fighting you. Change one, not your technique.
HTH · Reference layout

Homer Rhode Loop Knot — finished-state checks, on the shared reference layout

Homer Rhode Loop Knot — finished-state checks, on the shared reference layout
Hook the Horizon reference plate
Failure modes

When this family fails, it fails as these. The recovered end still outranks the name.

Fixed-loop family

A loop that stays the size you made, with a return that cannot cinch.

  • !Loop cinched around the hardware — action is dead
  • !Return path reversed, so it becomes a slip loop
  • !Fluoro in a lock that only behaves on mono
Fails when
  • !A gap left between the two knots, so the loop can creep larger under load
  • !Heavy leader set by hand without pliers, so the knots are not pulled firmly together
  • !Second knot tied with crossed turns, so it binds before the knots meet
Geometry
  • Too few wraps on heavy leader

    Loop walks and cinches

    Homer Rhode holds loop size with wraps, not hope · step 02

  • Loop collapsed while seating

    A failed Homer Rhode — not a tight loop

    Seat without shrinking the loop; a cinch is a noose · step 03

  • Loop size set after the wraps

    You cannot fix the swing after the barrel is on

    Size the loop first · step 01

If you saw this
  • Loop cinches closed

    Check

    • ?Loop holds under pull

    Then

    • Retie
    • Compare to Non-Slip Mono Loop
  • Finished check failed — Loop closes to the eye

    Check

    • ?Fixed loop preserved for lure action
    • ?Wraps ordered on the standing line
    • ?Loop does not close under load

    Then

    • Retie. A closed Homer Rhode removes free lure swing.
  • Too few wraps on heavy leader

    Check

    • ?Loop walks and cinches
    • ?Inspect step 02

    Then

    • Retie. Do not dress a defective structure and call it seated.
  • Loop collapsed while seating

    Check

    • ?A failed Homer Rhode — not a tight loop
    • ?Inspect step 03

    Then

    • Retie. Do not dress a defective structure and call it seated.
  • Loop size set after the wraps

    Check

    • ?You cannot fix the swing after the barrel is on
    • ?Inspect step 01

    Then

    • Retie. Do not dress a defective structure and call it seated.
Same family

Same failure class, different geometry. Open the plates — Diagnose still starts from the symptom.

This failed — start Diagnose
The bench · rep 1

Get it right with everything in your favour0/5 clean

Good light, dry hands, a table. Until the sequence is automatic here there is nothing for the harder rungs to test — you would only be learning that difficult conditions are difficult, which you already knew.

How · Tie it, check it against the list, log it. Five clean and the ladder opens.

Conditions for this rep
What went wrong, if anything

Nothing marked. Log it clean, or mark what happened first.

Not ideal for

  • ×Fine tippet dry-fly work
  • ×Maximum slim fixed eye

Strength, and where the number comes from

Not established

Its only circulating numbers are Knot Wars figures against rated strength (70.4–88.3%), which cannot be read as retention because the same dataset puts other knots above 130%.

Percentages come from published tests on their own line, their own knot-tyer and their own pull rate. Yours is a different system. Treat a figure as a reason to test, not as a result you already have.

Sources for this record

Record reviewed 2026-08-14

Vetted references

Already tied it?

Check the finished knot against what correct looks like before you load it.