Skip to content

Tie

Pile Hitch

Bight round the post, tucked under the standing part, then dropped over the top. Temporary. The standing part takes the load.

Beginner · Polyester / Nylon rope / Polypropylene / Natural fibre

Connection card

Pile Hitch

For loop dropped over a post, rope → bollard / piling.

What it joins Loop dropped over a post · Rope → bollard / piling. In polyester, nylon rope, polypropylene, natural fibre.
Turns 2 to 3. Count them before you seat it; afterwards you are guessing.
Shape Bight passed once round the post, tucked under the standing part, then dropped over the top as a collar above the turn
Tag end Bight end dropped over the top of the post, ringing it above the turn
Seated Both strands of the turn bedded down before the standing part takes the load
Start again if Bight never taken over the top. Hitch walks up and off the pile

This card does not say how strong the knot is. A retention figure comes from a bench, in one material, at one diameter, tied by somebody who ties it all day — and the line in your hand is none of those. What it does tell you is whether the thing you have just tied is the thing the record describes.

What this plate is telling you

Bight round the post, tucked under the standing part, then dropped over the top. Temporary. The standing part takes the load.

Save this as a picture and it works with a dead signal and a nearly dead battery, which is when a joint is most often tied badly. The rest of this page — the steps, the seating sequence, the failure modes and the bench — is for the evening before.

Before you start

  • ·The bight goes over the top of the post, so the top has to be reachable. On a post you cannot get over, use a round turn and two half hitches.
  • ·Make the bight long enough to go around the post and back over its top. How long depends on the thickness and height of the post.
  • ·Animated Knots does not recommend it as a permanent mooring hitch. For an overnight or unattended stay, use a round turn and two half hitches or a bowline.
  • ·It needs no rope end, so it can be tied in the middle of a line.
Line + hardware: Line long enough for a bight that goes around the post and back over its top

Step 1 of 4 · move 1 of 1. Fold a long bight and pass it round the post, both strands together

How to tie it — Step 1 of 4 · move 1 of 1
Fold a long bight and pass it round the post, both strands togetherA bight folded in the line goes once round the post, both strands together, and its end comes round to the front.
1End of the bight

swipe to step

01.1

Fold a long bight and pass it round the post, both strands together

Hold:
Left hand holds the line leading away and the short tail together
Move:
Right hand takes the bight round the back of the post and brings its end to the front

You should now see: Both strands of the bight side by side round the post, and the end of the bight at the front with plenty to spare.

Written step 01

Fold a long bight in the line and wrap it around the back of the post near its top, keeping both strands of the bight together.

You should now see

Both strands of the bight lie side by side around the back of the post, and the end of the bight comes round to the front with plenty to spare.

If it goes wrong

Making the bight too short. It gets around the post but cannot be lifted back over the top later, which you only find out at step 3.

Fix: Unwrap it and pull more line into the bight, enough to go around the post and back up over its top.

Why: The bight has to go around the post and then over its top, so the length it needs depends on how thick and how tall the post is.

Watch the tie

Fast Temporary Mooring With A Pile HitchWhyKnot · Opens on YouTube

External video from a creator we follow — not produced by us. Nothing on this page loads from YouTube until you follow the link.

Seating sequence — where failures are born

The step list compresses the finish. Run these phases in order, one at a time.

  1. 01 Form

    Build the structure loose enough to see every turn.

    None. Shape first.

  2. 02 Dress

    Nest every turn. Crossed parts will walk or jam.

    Light — hold the shape.

  3. 03 Set

    Load the standing part so the intended turns take the strain.

    Working load, not a snatch.

  4. 04 Check

    Confirm the lock still breaks or inspects as the job requires.

    None extra.

  5. 05 Commit

    Only load it after the structure reads correct. Wrong means remake.

    Working load, not a snatch.

Finished structure — what correct looks like

Pile Hitch, finishedPile Hitch, finished

Drawn from a rope model of this knot: which strand passes over which comes from where the rope actually lies.

  • ·Bight passed once round the post, tucked under the standing part, then dropped over the top as a collar above the turn
  • ·Both strands of the turn bedded down before the standing part takes the load
  • ·Bight end dropped over the top of the post, ringing it above the turn
  • ·One doubled turn round the post with the collar sitting on it, not a pile of extra turns

Verify before you load it

Every line is pass or fail. One fail means retie — do not load a knot you argued with.

  • 01Bight passed once round the post, tucked under the standing part, then dropped over the top as a collar above the turn
  • 02Both strands of the turn bedded down before the standing part takes the load
  • 03Bight end dropped over the top of the post, ringing it above the turn
  • 04One doubled turn round the post with the collar sitting on it, not a pile of extra turns
  • 05Bight tucked under the standing part; taken over it, nothing traps the line
  • 06Collar over the top of the post above the turn. Temporary. Tide means round turn and two half hitches
Something failed → open Diagnose

Field notes — dark, cold, gloves

  • ·Dress is the lock. A pretty knot that is not dressed is not finished.
  • ·HMPE usually wants a splice, not a hitch you learned in polyester.
  • ·If you cannot break or inspect it under the load you expect, it is the wrong job.
Failure modes

When this family fails, it fails as these. The recovered end still outranks the name.

Dropped-bight family

A finished eye dropped over a post — both legs share. Temporary, not overnight.

  • !Only one leg loaded — the hitch walks as a girth
  • !Bight never taken over the top of the pile
  • !Left as overnight mooring on a tide
Fails when
  • !The bight went over the standing part instead of under it, so nothing traps the line and the hitch pulls apart under load
  • !The bight was left hanging in front of the post instead of over the top, and one pull on the line unwraps it
  • !It is left as a permanent mooring, which Animated Knots does not recommend for this hitch
Geometry
  • Bight never taken over the top

    Hitch walks up and off the pile

    The bight must go over the top of the post to form the collar · step 03

  • One strand of the turn left slack

    Walks off under the first surge

    Both strands of the turn must bed down together, or one strand takes the load alone · step 04

  • Left through a tide cycle

    Temporary hitch asked to be a mooring plan

    Overnight cyclic tide is round turn and two half hitches · step 04

If you saw this
  • Hitch walks up and off the pile

    Check

    • ?Bight over the top
    • ?Bight tucked under the standing part
    • ?Pile taller than the hitch

    Then

    • Retie with a longer bight
    • Switch to round turn and two half hitches for a soak
  • Bight never taken over the top

    Check

    • ?Hitch walks up and off the pile
    • ?Inspect step 03

    Then

    • Retie. Do not dress a defective structure and call it seated.
  • One strand of the turn left slack

    Check

    • ?Walks off under the first surge
    • ?Inspect step 04

    Then

    • Retie. Do not dress a defective structure and call it seated.
  • Left through a tide cycle

    Check

    • ?Temporary hitch asked to be a mooring plan
    • ?Inspect step 04

    Then

    • Retie. Do not dress a defective structure and call it seated.
Same family

Same failure class, different geometry. Open the plates — Diagnose still starts from the symptom.

This failed — start Diagnose
The bench · rep 1

Get it right with everything in your favour0/5 clean

Good light, dry hands, a table. Until the sequence is automatic here there is nothing for the harder rungs to test — you would only be learning that difficult conditions are difficult, which you already knew.

How · Tie it, check it against the list, log it. Five clean and the ladder opens.

Conditions for this rep
What went wrong, if anything

Nothing marked. Log it clean, or mark what happened first.

Not ideal for

  • ×Overnight cyclic tide (use round turn and two half hitches)
  • ×A finished eye you already have (cow hitch)
  • ×HMPE

Strength, and where the number comes from

Not established

A temporary hitch with no published break test; nothing citable states a percentage.

Percentages come from published tests on their own line, their own knot-tyer and their own pull rate. Yours is a different system. Treat a figure as a reason to test, not as a result you already have.

Sources for this record

Record reviewed 2026-08-14

Vetted references

Already tied it?

Check the finished knot against what correct looks like before you load it.