Skip to content

Tie

Cow Hitch

Bight over a post, both legs through. Slips if only one leg loads.

Beginner · Polyester / Nylon rope / Polypropylene / Natural fibre

Connection card

Cow Hitch

For loop dropped over a post.

What it joins Loop dropped over a post. In polyester, nylon rope, polypropylene, natural fibre.
Turns 1 to 2. Count them before you seat it; afterwards you are guessing.
Shape Bight around the post or through the ring; both legs through the bight; hitch square
Tag end Both legs leave together — there is no single tail lock
Seated Dress square and load both legs before you walk away
Start again if Only one leg loaded. Hitch walks off the post

This card does not say how strong the knot is. A retention figure comes from a bench, in one material, at one diameter, tied by somebody who ties it all day — and the line in your hand is none of those. What it does tell you is whether the thing you have just tied is the thing the record describes.

What this plate is telling you

Bight over a post, both legs through. Slips if only one leg loads.

Save this as a picture and it works with a dead signal and a nearly dead battery, which is when a joint is most often tied badly. The rest of this page — the steps, the seating sequence, the failure modes and the bench — is for the evening before.

Before you start

  • ·It can fail unless both legs take equal tension. If only one leg can carry the load, tie a round turn and two half hitches instead.
  • ·It slips about as readily as a clove hitch. Do not make it the only tie for a critical load or for a boat left overnight; use a bowline or cleat hitch there.
  • ·The girth hitch is the same knot tied with a closed loop, so the same cautions apply.
  • ·On a post with an open top you can make it another way: form two loops, one the mirror of the other, place one on the post and fold the other on top.
Line + hardware: Rope that can be folded into a bight, A ring or a post to hitch to

Step 1 of 4 · move 1 of 1. Pass a bight of rope over the rail, so its closed end hangs down behind

How to tie it — Step 1 of 4 · move 1 of 1
Pass a bight of rope over the rail, so its closed end hangs down behindA bight of rope is laid over the rail, with its closed end hanging down behind the rail and both legs hanging in front.

swipe to step

01.1

Pass a bight of rope over the rail, so its closed end hangs down behind

Hold:
Left hand holds both legs in front of the rail
Move:
Right hand lays the bight over the rail and lets it hang down behind

You should now see: A bight over the rail, its closed end hanging behind and both legs hanging in front.

Written step 01

Fold the rope to form a bight and pass it through the ring from underneath, or around the back of the post, so the end of the bight comes out on your side.

You should now see

A U-shaped bight on your side of the ring or post, with the two legs of the rope running back through or around it.

If it goes wrong

Passing a single strand through the ring instead of a folded bight. You will see one rope end hanging free on your side rather than a U-shaped bight with two legs behind it.

Fix: Pull the strand back out, fold the rope double, and pass the fold through so a bight comes out on your side.

Why: If the top of a post is open, the same hitch can be made another way: form two loops, one the mirror of the other, place one on the post and fold the other on top of it.

Watch the tie

Learn How To Tie The Lark's Head Knot Mid LineWhyKnot · Opens on YouTube

External video from a creator we follow — not produced by us. Nothing on this page loads from YouTube until you follow the link.

Seating sequence — where failures are born

The step list compresses the finish. Run these phases in order, one at a time.

  1. 01 Form

    Build the structure loose enough to see every turn.

    None. Shape first.

  2. 02 Dress

    Nest every turn. Crossed parts will walk or jam.

    Light — hold the shape.

  3. 03 Set

    Load the standing part so the intended turns take the strain.

    Working load, not a snatch.

  4. 04 Check

    Confirm the lock still breaks or inspects as the job requires.

    None extra.

  5. 05 Commit

    Only load it after the structure reads correct. Wrong means remake.

    Working load, not a snatch.

Finished structure — what correct looks like

Cow Hitch, finishedCow Hitch, finished

Drawn from a rope model of this knot: which strand passes over which comes from where the rope actually lies.

  • ·Bight around the post or through the ring; both legs through the bight; hitch square
  • ·Dress square and load both legs before you walk away
  • ·Both legs leave together — there is no single tail lock
  • ·Square hitch, not a twist that is already walking

Verify before you load it

Every line is pass or fail. One fail means retie — do not load a knot you argued with.

  • 01Bight around the post or through the ring; both legs through the bight; hitch square
  • 02Dress square and load both legs before you walk away
  • 03Both legs leave together — there is no single tail lock
  • 04Square hitch, not a twist that is already walking
  • 05One leg through the bight is a girth that will walk
  • 06Both legs loaded. Temporary. Tide means a different hitch
Something failed → open Diagnose

Field notes — dark, cold, gloves

  • ·Dress is the lock. A pretty knot that is not dressed is not finished.
  • ·HMPE usually wants a splice, not a hitch you learned in polyester.
  • ·If you cannot break or inspect it under the load you expect, it is the wrong job.
Failure modes

When this family fails, it fails as these. The recovered end still outranks the name.

Dropped-bight family

A finished eye dropped over a post — both legs share. Temporary, not overnight.

  • !Only one leg loaded — the hitch walks as a girth
  • !Bight never taken over the top of the pile
  • !Left as overnight mooring on a tide
Fails when
  • !Only one leg takes the load, so the hitch slides or rolls around the ring or post.
  • !The two legs pull with unequal tension, for example when they were left crossed.
  • !One leg runs outside the bight, leaving one of the two half hitches unmade.
  • !It is the only attachment for a critical load, where it can slip about as readily as a clove hitch.
Geometry
  • Only one leg loaded

    Hitch walks off the post

    Animated Knots: holds when both legs load; slips on a single-leg load · step 04

  • One leg through the bight

    Girth that walks under the first snatch

    Both legs must pass through the bight · step 02

  • Twisted or used as overnight mooring

    Walks off through a tide cycle

    A cow hitch is a short stay, not a mooring plan · step 04

If you saw this
  • Hitch walks off the post

    Check

    • ?Both legs sharing the load
    • ?Hitch square

    Then

    • Load both legs or switch to a round turn and two half hitches
  • Only one leg loaded

    Check

    • ?Hitch walks off the post
    • ?Inspect step 04

    Then

    • Retie. Do not dress a defective structure and call it seated.
  • One leg through the bight

    Check

    • ?Girth that walks under the first snatch
    • ?Inspect step 02

    Then

    • Retie. Do not dress a defective structure and call it seated.
  • Twisted or used as overnight mooring

    Check

    • ?Walks off through a tide cycle
    • ?Inspect step 04

    Then

    • Retie. Do not dress a defective structure and call it seated.
Same family

Same failure class, different geometry. Open the plates — Diagnose still starts from the symptom.

This failed — start Diagnose
The bench · rep 1

Get it right with everything in your favour0/5 clean

Good light, dry hands, a table. Until the sequence is automatic here there is nothing for the harder rungs to test — you would only be learning that difficult conditions are difficult, which you already knew.

How · Tie it, check it against the list, log it. Five clean and the ladder opens.

Conditions for this rep
What went wrong, if anything

Nothing marked. Log it clean, or mark what happened first.

Not ideal for

  • ×Load on one leg only
  • ×A standing mooring (use round turn and two half hitches)
  • ×Cyclic snatch on a single strap

Strength, and where the number comes from

Not established

Broken on a tensile machine in a peer-reviewed arborist study that then declined to publish an efficiency figure, because the unknotted rope was never tested — so real test data exists and no retention percentage does.

Percentages come from published tests on their own line, their own knot-tyer and their own pull rate. Yours is a different system. Treat a figure as a reason to test, not as a result you already have.

Sources for this record

Record reviewed 2026-08-14

Already tied it?