Skip to content

Tie

Timber Hitch

Hoist or drag a spar. Holds under tension only. Collapses unloaded — that is the hitch.

Beginner · Polyester / Nylon rope / Polypropylene / Natural fibre

Connection card

Timber Hitch

For load transfer / snubber.

What it joins Load transfer / snubber. In polyester, nylon rope, polypropylene, natural fibre.
Turns 3 to 5. Count them before you seat it; afterwards you are guessing.
Shape Around the spar, working end dogged around its own standing part with three or more tucks
Tag end Three or more dogged tucks on the standing part — a single tuck walks
Seated Dress the dogs tight, then keep it loaded
Start again if Too few dogged tucks. Walks as soon as the spar turns

This card does not say how strong the knot is. A retention figure comes from a bench, in one material, at one diameter, tied by somebody who ties it all day — and the line in your hand is none of those. What it does tell you is whether the thing you have just tied is the thing the record describes.

What this plate is telling you

Hoist or drag a spar. Holds under tension only. Collapses unloaded — that is the hitch.

Save this as a picture and it works with a dead signal and a nearly dead battery, which is when a joint is most often tied badly. The rest of this page — the steps, the seating sequence, the failure modes and the bench — is for the evening before.

Before you start

  • ·It holds only while the standing part stays loaded. With no pull on it the hitch practically falls apart and can drop off the spar.
  • ·To hoist or tow a spar lengthwise, tie the hitch near the middle and add a half hitch around the spar near the hauling end.
  • ·Leave enough end to twist three times around the rope that circles the spar, following the lay of the rope.
  • ·For a line that goes slack and then loads again, tie a hitch that holds without tension, such as a rolling hitch.
Line + hardware: Rope and a spar, timber, or pole to hoist or drag

Step 1 of 4 · move 1 of 2. Pass the end round the spar: over the top, down the back and up the front

How to tie it — Step 1 of 4 · move 1 of 2
Pass the end round the spar: over the top, down the back and up the frontThe rope goes over the top of the spar, down the back, under it and back up the front, a little along from the standing part.

swipe to step

01.1

Pass the end round the spar: over the top, down the back and up the front

Hold:
Left hand holds the standing part
Move:
Right hand takes the end over the spar, under it, and back up the front
Written step 01

Pass the end around the spar, then take it around the standing part.

You should now see

The line circling the spar, with the end hooked around the standing part and pointing back along the rope that goes around the spar.

If it goes wrong

Taking the end around the spar a second time instead of around the standing part, which leaves a round turn rather than the start of the hitch.

Fix: Unwind the extra turn and pass the end around the standing part.

Watch the tie

Timber Hitch | How to Tie the Timber HitchAnimatedKnots · Opens on YouTube

External video from a creator we follow — not produced by us. Nothing on this page loads from YouTube until you follow the link.

Seating sequence — where failures are born

The step list compresses the finish. Run these phases in order, one at a time.

  1. 01 Form

    Build the structure loose enough to see every turn.

    None. Shape first.

  2. 02 Dress

    Nest every turn. Crossed parts will walk or jam.

    Light — hold the shape.

  3. 03 Set

    Load the standing part so the intended turns take the strain.

    Working load, not a snatch.

  4. 04 Check

    Confirm the lock still breaks or inspects as the job requires.

    None extra.

  5. 05 Commit

    Only load it after the structure reads correct. Wrong means remake.

    Working load, not a snatch.

Finished structure — what correct looks like

Timber Hitch, finishedTimber Hitch, finished

Drawn from a rope model of this knot: which strand passes over which comes from where the rope actually lies.

  • ·Around the spar, working end dogged around its own standing part with three or more tucks
  • ·Dress the dogs tight, then keep it loaded
  • ·Three or more dogged tucks on the standing part — a single tuck walks
  • ·Dogged tucks biting the standing part, not floating

Verify before you load it

Every line is pass or fail. One fail means retie — do not load a knot you argued with.

  • 01Around the spar, working end dogged around its own standing part with three or more tucks
  • 02Dress the dogs tight, then keep it loaded
  • 03Three or more dogged tucks on the standing part — a single tuck walks
  • 04Dogged tucks biting the standing part, not floating
  • 05Too few tucks, or used as a slack hold, dumps
  • 06Loaded. Collapses when slack — that is correct. Need slack hold? Wrong hitch
Something failed → open Diagnose

Field notes — dark, cold, gloves

  • ·Dress is the lock. A pretty knot that is not dressed is not finished.
  • ·HMPE usually wants a splice, not a hitch you learned in polyester.
  • ·If you cannot break or inspect it under the load you expect, it is the wrong job.
Failure modes

When this family fails, it fails as these. The recovered end still outranks the name.

Bind / drag family

A binding that holds two parts, or a hitch that tightens as you drag.

  • !Reef knot used as a bend — it spills
  • !Granny form (both tucks the same way)
  • !Timber hitch with too few wraps on the object, so it walks
Fails when
  • !The pull comes off, so the hitch loosens and can drop off the spar
  • !The end is twisted around the standing part, or only once, so it slides out when pulled
  • !The twists are not pressed against the spar, so the end is not trapped and works free under load
  • !A spar hoisted or towed lengthwise has no half hitch, so it twists out of line with the pull
Geometry
  • Too few dogged tucks

    Walks as soon as the spar turns

    Three or more tucks are the hitch · step 02

  • Loose dogs never dressed

    Dumps under the first hoist

    The tucks must bite the standing part · step 03

  • Expected to hold slack, or used as a chain snubber

    Collapses the moment the load comes off

    This hitch holds under tension only; a standing transfer is rolling or icicle · step 04

If you saw this
  • Hitch dumps when the load comes off, or walks while hoisting

    Check

    • ?Three or more dogged tucks
    • ?Load on the standing part

    Then

    • Add tucks
    • Keep it loaded
    • Use rolling or icicle for a standing transfer
  • Too few dogged tucks

    Check

    • ?Walks as soon as the spar turns
    • ?Inspect step 02

    Then

    • Retie. Do not dress a defective structure and call it seated.
  • Loose dogs never dressed

    Check

    • ?Dumps under the first hoist
    • ?Inspect step 03

    Then

    • Retie. Do not dress a defective structure and call it seated.
  • Expected to hold slack, or used as a chain snubber

    Check

    • ?Collapses the moment the load comes off
    • ?Inspect step 04

    Then

    • Retie. Do not dress a defective structure and call it seated.
Same family

Same failure class, different geometry. Open the plates — Diagnose still starts from the symptom.

This failed — start Diagnose
The bench · rep 1

Get it right with everything in your favour0/5 clean

Good light, dry hands, a table. Until the sequence is automatic here there is nothing for the harder rungs to test — you would only be learning that difficult conditions are difficult, which you already knew.

How · Tie it, check it against the list, log it. Five clean and the ladder opens.

Conditions for this rep
What went wrong, if anything

Nothing marked. Log it clean, or mark what happened first.

Not ideal for

  • ×A standing attachment that must hold slack
  • ×A slick snubber on chain (rolling or icicle)
  • ×HMPE

Strength, and where the number comes from

70% of the weaker line

Instructor consensus

manila rope up to 1" diameter, from an efficiency table credited to The Art of Knotting and Splicing (United States Naval Institute), reprinted with no test data behind it; a modern arborist study broke this hitch on a tensile machine and published no efficiency figure at all

Knot Strength Chart International Guild of Knot Tyers — Solent Branch

Percentages come from published tests on their own line, their own knot-tyer and their own pull rate. Yours is a different system. Treat a figure as a reason to test, not as a result you already have.

Sources for this record

Record reviewed 2026-08-14

Vetted references

Already tied it?

Check the finished knot against what correct looks like before you load it.