One tap loads a realistic setup and ranks the knots.
Every connection is a compromise between what holds, what you can build in the conditions you are actually standing in, and how often you will rebuild it.
Or pick the job yourself
Terminal, line-to-line, and the rest. We’ll say what holds.
Saved setups · 0
01
The job
What is physically being joined.
Terminal
Line to line
Loops & spool
Rig
02
Line and leader
The line decides what is even allowed.
Main line
Fiber / material · optional
What type of braid? · optional
Finish · optional
Single-side job
This connection only needs a main line — no leader for this job. Switch to a two-sided join to declare both sides.
03
On the water
Only the conditions you tap count.
Retie tempo
Hands
04
Region
A starting guess for US water. You can still change every condition — it never forces a knot.
US region
No region picked
05
Where you are
Water first, then how you are standing. You can still change the conditions.
Waterbody
Platform
Optional. Changes hands, stability and retie tempo — not the water chemistry.